Control a phase

  1. Open the Phase Status dialog (Edit → Phase Status).
  2. Select the phase you want to monitor from the Selected Phase drop-down list.
  3. Select an array to monitor and control from the Parameter Arrays drop-down list.
  4. Control the phase by using the buttons on the bottom left side of the dialog.
  5. Click the Close button to exit the Phase Status dialog.
Note:
Enter integer values for Named Set report parameters.