The installation sequence described in this topic is only a
recommendation. You can perform these steps in the order that best meets the
needs of your project.
- Install horizontal DIN
rails
- Snap the Power /Controller
carrier and 8-Wide I/O Carriers onto the DIN rail
- Slide the carriers
together to form the LocalBus
- Install a DIN Rail Stop at
each end of the carriers on each DIN Rail
- Snap an S-series
controller onto the Power / Controller Carrier
- Snap the S-series System
Power Supply (24 VDC) onto the Power / Controller Carrier
- Install the terminal
blocks onto the 8-Wide Carrier
- Connect field wiring to
the terminal blocks
- Snap the S-series I/O
cards onto the terminal blocks on the 8-Wide I/O Carrier
- Install the DeltaV
workstations, servers, and system identifier
- Set up the DeltaV Control
Network by installing any switches and cabling between nodes
- Connect bulk 24 VDC power
to the power input terminals on the carriers to power up the system
- Check out the installation
by checking cable connections, power supply voltages, the LEDs on the devices
and cards, and testing field wiring