Installing Your DeltaV System

This chapter provides detailed instructions and diagrams for system installation. It includes recommendations for planning the installation and provides a brief overview of the steps required for system installation.

This chapter describes installations that are mounted vertically on horizontal carriers.

For Class I Division 2 installations, refer to the document DeltaV Scalable Process System, Class I Division 2 Installation Instructions, (12P1293) on the DeltaV Documentation Library DVD.

For Zone 2 installations, refer to the document DeltaV Scalable Process System, Zone 2 Installation Instructions, (12P2046) on the DeltaV Documentation Library DVD.

For NAMUR NE 21 installations, refer to the document DeltaV Digital Automation System Namur NE 21 Installation Instructions, (12P2822) on the DeltaV Documentation Library DVD.

For Marine Certified DeltaV installations, refer to the following installation requirements. These requirements allow the DeltaV system to support the reduced EMC interference requirements at the Marine Navigation Frequencies. Marine certification is approved for 24 V powered systems only. For additional requirements and for a list of the specific DeltaV equipment that is approved for marine installation, refer to the specific certifying agency.

For all exposed deck locations:

For non-exposed deck locations:

Note

All electrical installations must conform to applicable federal, state, and local codes and regulations. All installation and maintenance procedures described in this document must be performed by qualified personnel and all equipment must be used only for the purposes described. If the equipment is used in a manner not specified, the protection provided by the equipment may be impaired.