Using fieldbus technology in the control strategy > Fieldbus control strategy procedures

Assign fieldbus strategy to a node

Now, you assign the strategy to a node to tell the DeltaV system where it will run. A strategy can be assigned to a workstation or a controller. Generally, control strategies run in a controller.

  1. Click the Assign to Node button on the Control Studio toolbar.
  2. Select the controller to which you want to assign the module and click OK.