At this point, the controller must be disconnected from the Engineering Station (or at least shut down the Engineering Station) and connected to your DeltaV balance-of-plant system so that it can be detected. The controller cannot be detected by this utility if it is still communicating with the Engineering Station.
Your process must be in a safe and steady state before proceeding. During the process of re-commissioning the controller and any associated I/O nodes are first decommissioned and cannot control a live process.
Locked Standalone DeltaV PK controllers will not decommission. You must unlock the PK controller prior to decommissioning.
Locked nodes attached to a Standalone DeltaV PK controller will not decommission. You must unlock the attached node prior to decommissioning the PK controller
You must have a commissioned controller attached to the DeltaV network to perform this step.
The PK controller is re-commissioned as a node in the connected balance-of-plant DeltaV system. You must now download the ProfessionalPLUS Setup Data.
Click Next to move to the Conclusion page.