Finishing the process picture

Add the remaining dynamos to the process picture

This procedure shows a suggested order for creating the objects. You can create them in any order you want.

  1. Add the vertical pipe to connect the tank and motor. Add an elbow pipe section to connect the motor to the horizontal pipe. Move and resize objects as necessary.
  2. Add the block valve (for XV-101) according to the information in the table.
  3. Add a pipe to connect the pump and block valve.
  4. Add the regulatory valve for the control loop (FIC-101).
  5. Add two sections of pipe between the block valve and regulatory valve by copying and pasting (or duplicating) the existing section of horizontal pipe. Right-click, and then use the context menu to select your editing choices.
  6. Using the Line tool, draw short vertical lines to indicate the orifice plate measuring the flow.
  7. Rearrange your datalinks so that your picture looks like the image in the dynamos overview topic. Add text labels as shown.