We will start by configuring the running logic for a relatively simple phase class--FILL. The SFC for the running logic starts with a step to ensure the outlet valve is closed. It then sets the TOTALIZER equipment module to totalize_fast, waits for the fill amount to be 90%, and then sets it to totalize_accurate. It resets TOTALIZER when the desired fill level is reached.