SISCHARMsInstall
← All books
Planning the installation
Tools required to install DeltaV hardware
Torque limits for mounting screws
Wiring guidelines
Installing CHARMs Smart Logic Solver SIS hardware
CHARMs Smart Logic Solver (CSLS) SIS hardware overview
Recommended sequence for installing CHARMs Smart Logic Solver SIS hardware
Recommendations for installing vertical DIN rails
Install an SZ Controller Carrier on the DIN rail
Install a CHARMs Smart Logic Solver Carrier on the DIN rail
Install a Dual Universal Safety Carrier on the DIN rail
Remove a Dual Universal Safety Carrier from the DIN rail
Install the first CHARM Baseplate on the DIN rail
Install the other CHARM Baseplates onto the DIN rail
Install a Separation Wall for Intrinsically Safe applications
Install I.S. Baseplates
Remove a CHARMs Smart Logic Solver Carrier or Baseplate from the DIN rail
Install the Column Terminator onto the DIN rail
Install a DIN Rail Stop
Connect power to SZ Controllers
Connect power to Local Safety Network Bridges or SZ Controllers
Connect power to LS CHARM I/O
Connect power to LS I.S. CHARM I/O
Extend CHARM power to other baseplates
Install SZ Controllers onto the carrier
Install CHARMs Smart Logic Solvers onto the carrier
Install Power Modules onto the carrier
Install Local Safety Network Bridges or SZ Controllers on the Dual Universal Safety Carrier
Install LS CHARMs
Install LS I.S. CHARMs
Reset the keying mechanism on a CHARM Terminal Block
Reset the keying mechanism on an I.S. CHARM Terminal Block
Label the CHARMs installed on each baseplate
DeltaV hardware ready for transportation
Making network connections
Communication in a CHARMs Smart Logic Solver SIS system
Connect the CHARMs Smart Logic Solver to the Local Safety Network
Connect the SZ Controller to the Area Control Network and the Local Safety Network
Connect an SZ Controller